Industrial plant with tall stainless-steel silos, a tanker truck at the loading bay and a ditch in front
Industrial

Industrial

Zuivelfabriek De Weide

A dairy processing plant with stainless-steel storage silos, tanker loading bays and a long production hall beside the polder.

Completed
2002
Location
Leeuwarden
Floor area
36,000 m²
Sector
Industrial
Scope
New Construction

Project overview

Construction time

26 months

Zuivelfabriek De Weide is a 36,000 m² dairy processing plant with stainless-steel storage silos, tanker loading bays and a long production hall. Hygienic finishes and strict zoning keep the production areas clean.

Our approach

We coordinated the building with the specialist process installers from day one, leaving openings, foundations and service routes exactly where the tanks and pipework needed them. Milk tankers kept arriving at the existing plant next door throughout.

Highlights

  1. 01Stainless-steel storage silos with service platform
  2. 02Tanker loading and unloading bays
  3. 03Hygienic production zones
Next projectKantoor Lindenhof