
Industrial
Industrial
Zuivelfabriek De Weide
A dairy processing plant with stainless-steel storage silos, tanker loading bays and a long production hall beside the polder.
- Completed
- 2002
- Location
- Leeuwarden
- Floor area
- 36,000 m²
- Sector
- Industrial
- Scope
- New Construction
Project overview
Construction time
26 months
Zuivelfabriek De Weide is a 36,000 m² dairy processing plant with stainless-steel storage silos, tanker loading bays and a long production hall. Hygienic finishes and strict zoning keep the production areas clean.
Our approach
We coordinated the building with the specialist process installers from day one, leaving openings, foundations and service routes exactly where the tanks and pipework needed them. Milk tankers kept arriving at the existing plant next door throughout.
Highlights
- 01Stainless-steel storage silos with service platform
- 02Tanker loading and unloading bays
- 03Hygienic production zones
