Renovation & Transformation
Renovation & Transformation
Kantoor Lindenhof
A tired 1970s office block given new brick, large dark-framed windows, a welcoming lit entrance and an energy label raised from G to A.
- Completed
- 2021
- Location
- Rotterdam
- Floor area
- 11,400 m²
- Sector
- Renovation & Transformation
- Construction time
- 16 months
Project overview
Construction time
16 months
Kantoor Lindenhof was a 1974 office block with weathered concrete bands, single glazing and a dark, uninviting entrance. Instead of demolishing it, we kept the concrete structure and gave the building a new skin: warm brick, large dark-framed windows and a generous lit canopy.
Our approach
Keeping the structure saved thousands of tonnes of CO₂ compared with new-build. We added insulation, new installations and solar panels, and stripped the interior back to open, flexible floors.
Highlights
- 01Energy label raised from G to A
- 02Original concrete structure reused
- 03New brick façade and full-height glazing