
Renovation & Transformation
Renovation & Transformation
Pakhuis De Kade
An empty quayside warehouse transformed into creative workspace, with restored brickwork, new steel windows and a glazed entrance.
- Completed
- 2018
- Location
- Zaandam
- Floor area
- 6,900 m²
- Sector
- Renovation & Transformation
- Construction time
- 14 months
Project overview
Construction time
14 months
Pakhuis De Kade stood empty for years: boarded-up windows, rusting doors and crumbling brickwork along the quay. Today it is creative workspace full of daylight, with its industrial character carefully kept.
Our approach
We repaired and repointed the brickwork, replaced the old windows with slim steel frames in the original pattern and turned the large loading doors into glazed entrances. The steel canopy beam was cleaned and kept as a reminder of the building's past.
Highlights
- 01Restored historic brickwork
- 02New steel windows in the original pattern
- 03Loading doors turned into glazed entrances
