
Projects
Infrastructure
Stadshaven Bridge
A concrete road and cycle bridge across the harbour canal, with separated cycle lanes and low-maintenance piers.
- Completed
- 2008
- Investment
- €24 million
- Location
- Zwolle
- Length
- 180 m
- Sector
- Infrastructure
- Scope
- Design & Build
Project overview
Construction time
18 months
A 180-metre road and cycle bridge across the harbour canal, designed and built by one integrated team. Prefabricated deck sections kept the waterway open to shipping for most of the works.
Our approach
Deck sections were cast off site, floated in by barge and lifted into place during a handful of planned weekend closures. Cyclists and boats kept moving for almost the entire build.
Highlights
- 01Separated cycle lanes in both directions
- 02Prefabricated concrete deck sections
- 03Low-maintenance piers designed for 100 years
