
Interior Fit-Out
Interior Fit-Out
De Ketelfabriek Workspace
Flexible workspace inside a former boiler factory, combining the original brick hall with glazed meeting rooms, a mezzanine and a long shared table.
- Completed
- 2020
- Location
- Hengelo
- Floor area
- 5,100 m²
- Sector
- Interior Fit-Out
- Construction time
- 9 months
Project overview
Construction time
9 months
De Ketelfabriek Workspace brings flexible offices into a former boiler factory. The brick hall, arched windows and steel structure stay visible, while glazed meeting rooms, a mezzanine and a long shared table make it work as a modern office.
Our approach
New elements were built as free-standing boxes, so the historic hall was barely touched. Underfloor heating in the polished concrete keeps the large space comfortable all year.
Highlights
- 01Original brick hall and arched windows kept
- 02Free-standing glazed meeting rooms and mezzanine
- 03Underfloor heating in polished concrete
